Tahun 2020
|
Conference Proceedin
Scopus Q3 |
Effects of cup lump natural rubber as an additive on the characteristics of asphalt-rubber products |
IOP Conference Series: Materials Science and Engineering |
0 |
|
- |
DEVELOPMENT OF THE INFLOW PREDICTION MODEL ON TROPICAL RESERVOIR USING ADAPTIVE NEURO FUZZY INFERENCE SYSTEM |
IJCIET 11 (4), 171 - 183 |
0 |
|
Tahun 2019
|
S3 |
Evaluasi dan Proyeksi Kebutuhan Bangunan Terminal Bandar Udara Internasional Kualanamu |
Jurnal Rekayasa Sipil (JRS-Unand) 15 (2), 115-128 |
0 |
|
S2 |
Developing psychomotor evaluation instrument of biochemistry practicum for university students of biology education |
REiD (Research and Evaluation in Education) 5 (1), 1-9 |
1 |
|
- |
Application of Hybrid-Ihacres models for water availability in Siak River |
MATEC Web of Conferences 276, 04017 |
3 |
|
- |
Kajian Pengaruh Pemanfaatan Limbah Faba (Fly Ash Dan Bottom Ash) pada Konstruksi Lapisan Base Perkerasan Jalan |
JURNAL TEKNIK 13 (2), 112-119 |
0 |
|
- |
Pembuatan Aspal Modifikasi Polimer Berbasis Karet Alam Tanpa dan Dengan Mastikasi |
Prosiding Seminar Nasional Hasil Litbangyasa Industri II 2 (2), 260-269 |
0 |
|
Tahun 2018
|
- |
Melestarikan Alam Indonesia. |
Asian Journal of Crop Science 12 (1), 27-38 |
0 |
|
- |
Evaluasi Harga Tarif Tol Berdasarkan Analisis Kelayakan Finansial (Studi Kasus: Jalan Tol Medan-Binjai) |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5, 1-13 |
0 |
|
- |
Pengaruh Penambahan Limbah Botol Plastik Terhadap Karakteristik Marshall Pada Beton Aspal Lapis Pengikat |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5, 1-9 |
0 |
|
- |
Penentuan Tarif Tol Berdasarkan Analisis Kelayakan Finansial (Studi Kasus: Jalan Tol Pekanbaru-Minas) |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5, 1-9 |
0 |
|
- |
Pengaruh Penambahan Bahan Alami Lateks (Getah Karet) Terhadap Karakteristik Beton Aspal Lapis Pengikat Dengan Pengujian Marshall |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5, 1-11 |
0 |
|
- |
Pengaruh Penggantian Bahan Pengisi Semen Dengan Kombinasi Abu Bata Dan Abu Sekam Padi Pada Campuran Aspal AC-BC |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5, 1-12 |
0 |
|
- |
Pengaruh Penggantian Bahan Pengisi Semen Dengan Kombinasi Abu Bata Dan Abu Sekam Padi Pada Campuran Aspal AC-WC |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5, 1-10 |
0 |
|
- |
Penggunaan Abu Kulit Kerang Sebagai Bahan Pengisi (Filler) Dalam Campuran Aspal Jenis Ac-Wc Dengan Pengujian Marshall |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5, 1-12 |
0 |
|
- |
Risk and Uncertainty in the Medan-Binjai Toll Road Infrastructure Project, Indonesia Based on the Stochastic Analyzes |
European Journal of Engineering Research and Science 3 (6), 39-46 |
3 |
|
Tahun 2017
|
- |
Analisis Karakteristik Lalulintas Jalan Tol Trans Sumatera (Studi Kasus Ruas Jalan Tol Medan-Binjai) |
Jurnal APTEK 9 (1), 10-17 |
1 |
|
- |
Hubungan Asupan Zat Gizi Dengan Kejadian Obesitas Sentral Pegawai di Kantor Wilayah Kementerian Agama Provinsi Sumatera Barat Tahun 2017 |
Universitas Andalas |
0 |
|
- |
Evaluasi Risiko Konstruksi Pada Proyek Pembangunan Sadira Plaza Dan Tangram Hotel Pekanbaru |
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains 5 (1), 1-14 |
0 |
|
- |
Pemanfaatan limbah oil sludge untuk campuran beraspal jenis LATASTON (Lapis Tipis Aspal Beton) dengan pengujian marshall |
Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau 4 (1), 1-9 |
1 |
|
Tahun 2016
|
- |
Analisa Sensitivitas Pertumbuhan Lalu Lintas Dan Probabilitas Risiko Pada Pembangunan Jalan Tol Kategori Priority Project |
Jurnal Teknik Sipil 12 (3) |
0 |
|
- |
PENGARUH PENGGUNAAN AGREGAT PASIR ALAM TERHADAP KINERJA LAPISAN PERMUKAAN ASPHALT TREATED BASE |
Proceedings ACES (Annual Civil Engineering Seminar) 1, 124-131 |
0 |
|
Tahun 2015
|
- |
MODEL PENILAIAN PENAWARAN TERENDAH YANG RESPONSIF PADA PENGADAAN BARANG DAN JASA PEMERINTAH BERBASIS TEKNOLOGI KOMPUTASI |
Proceedings ACES (Annual Civil Engineering Seminar) 1, 46-54 |
0 |
|
Tahun 2014
|
- |
ANALISA DISPARITAS HARGA PENAWARAN TERHADAP HARGA PERKIRAAN SENDIRI PADA PEMILIHAN PENYEDIA JASA PEKERJAAN JALAN |
Jurnal Aptek 5 (2), 99-108 |
2 |
|
Tahun 2011
|
- |
Analisa Kelayakan Investasi Jalan Tol Pekanbaru-Dumai Dengan Penerapan Model NPV-at Risk |
Jurnal Tepak Manajemen Bisnis 3, 1-20 |
0 |
|
- |
JISAT |
Jurnal Teknobiologi 2 (1), 41-48 |
0 |
|
- |
Pendekatan Stokastik Dalam Kajian Kelayakan Pembangunan Jalan Tol Studi Kasus Rencana Ruas Tol Kandis - Dumai |
Jurnal Teknobiologi 2 (1), 41-48 |
0 |
|
Tahun 2010
|
- |
pengantar Bisnis Jasa Konstruksi |
Cetakan Ketiga, Andy Offset Yogyakarta |
2 |
|
- |
Pengantar Bisnis Jasa Pelaksana Konstruksi |
Penerbit Andi |
65 |
|
Tahun 2009
|
- |
Andi Offset |
Yogyakarta |
2 |
|
- |
Pengantar Bisnis Jasa Pelaksanaan Konstruksi |
Andi Yogyakarta |
4 |
|
Unknown
|
- |
Analisis Biaya Pemakaian Alat Berat pada Proyek Rekontruksi Jalan Batas Kota Pariaman–Manggopoh Kabupaten Padang Pariaman Provinsi Sumatera Barat |
Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau 5 (1), 1-16 |
0 |
|
- |
Evaluasi Kegagalan Penyedia Jasa Konstruksi dalam Proses Pengadaan Jasa Konstruksi dengan Sistem Elektronik (Studi Kasus: Dinas Pekerjaan Umum Kabupaten Pelalawan) |
Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau 4 (1), 1-10 |
0 |
|
- |
Evaluasi Risiko Keterlambatan pada Proyek Konstruksi Pembangkit Listrik Tenaga Uap (PLTU) Tembilahan |
Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau 4 (2), 1-11 |
1 |
|
- |
Evaluasi Risiko Keterlambatan Pekerjaan Pembangunan Apron Baru Bandara Sultan Syarif Kasim II, Pekanbaru |
Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau 4 (2), 1-10 |
0 |
|
- |
Pemanfaatan Limbah Oil Sludge untuk Campuran Beraspal Jenis Laston Pengikat (AC-BC) dengan Pengujian Marshall |
Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau 4 (2), 1-9 |
0 |
|
- |
Studi Kelayakan Investasi Proyek Pembangunan Pembangkit Listrik Tenaga Uap PLTU Riau 2x110 MW Studi Kasus: Proyek PLTU Riau 2x110 MW Pekanbaru |
Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau 5 (1), 1-9 |
0 |
|